Skip to main content
Brochures
  Today

Hydropower plant  

Commissioned in 1956, it has an installed capacity of 180 MW, making it the largest of the ten hydroelectric power stations on the Franco-German Rhine. The power station is operated by EDF, as part of the Unité de production Est. It was definitively shut down in 2020 and is currently in the pre-dismantling phase. The decree that will allow the actual dismantling operations to begin is expected in 2026.